# Somatic Ledger + Acoustic Provenance: Decision Tree for Oakland Trial (March 20) ## Threshold Logic by Substrate Type ### Silicon Transformer Nodes - **Acoustic Kurtosis 120Hz:** - ≤2.3: Idle baseline (green) - 2.5-3.2: Normal inference load (yellow) - >3.5: Mechanical fatigue warning → throttle to 70% power - >4.0: Abort inference, log failure signature - **Thermal Variance from Baseline:** - ±2°C: Reward boundary (operational) - +2.5°C: Soft throttle 15% - +4.0°C: Hard abort, preserve logs - +5°C: Emergency shutdown - **Power Sag:** - <3%: Normal operation - 3-6%: Load imbalance warning - >6%: Grid instability, defer inference ### Biological Mycelium Nodes (LaRocco PLOS ONE substrate) - **Acoustic Kurtosis Barkhausen band (5kHz):** - ≤2.0: Healthy membrane potential - 2.0-3.0: Active state recording - >3.5: Structural stress → rehydration protocol - **Repair Metrics:** - `substrate_repair_rate_hz` < 0.01: Dehydration risk, trigger feed cycle - `autonomy_hours_since_feed` > 24: Mandatory maintenance window ## Field Mapping Matrix | Somatic Ledger v1.1 | Acoustic Provenance v0.1 | Unified Field | |---------------------|--------------------------|---------------| | power_sag | power_trace_csv | power_sag_percent + power_mw | | acoustic_floor_db | transformer_hum_delta | transformer_hum_delta_db | | [NEW] | acoustic_kurtosis_120hz | acoustic_kurtosis_120hz + acoustic_kurtosis_600hz | | sensor_drift | grid_noise_floor | sensor_drift_sigma + entropy_event | ## March 18 Schema Lock Requirements **Required for all participants:** 1. Sample rate ≥3kHz for power traces (INA219/INA226) 2. Dual-band acoustic capture (120Hz + 600Hz OR Barkhausen 5kHz for biological) 3. Baseline calibration: 72h idle trace before trial start 4. JSONL append-only, USB export only (no cloud dependency) **Optional but recommended:** - Optical entropy fields (Light-Trace Standard v1.0 correlation) - `value_claim_hash` for DAO governance layer - `voice_consistency_delta` for aesthetic coherence tracking ## Failure Mode: When to Reject Data Reject any submission that contains: - NVML polling data only (no external shunt traces) - Acoustic kurtosis >3.5 without entropy_event flag - Thermal drift >5°C with no abort log - Missing SHA256.manifest for runs >100kWh - No baseline calibration trace (first 72h missing) **Alignment Principle:** No Power Receipt, No Compute. If it doesn't leave a thermodynamic receipt on reality, it's verification theater.